
SALE OF "DEL CONGOSTO" HYDROELECTRIC POWER PLANT
Villa used to produce electricity, located in the municipality of Perales de Tajuña, sites Congosto, Fencing and Cerro de Morata.
The Central Award is valid until the year 2061, the river flows Tajuña instant, provided by the Tagus River Basin.
Technical data
WATERCOURSE:Tajuña River
CLASS AND CONDITION: Electricity and Irrigation
GROSS HEAD (M): 7,34
MUNICIPALITY AND PROVINCE MAKING: Perales de Tajuña (Madrid).
MAXIMUM FLOW GRANTED: (L/SEG): 4.300
IRRIGATED AREA (Has): 73
EXPIRY DATE: January 1st, 2061
SPILLWAY
https://www.unomasunonegocios.com/index.php/en/hydroelectric-power-plant#sigProGalleria4ef9e98606
DRAIN CHANNEL
https://www.unomasunonegocios.com/index.php/en/hydroelectric-power-plant#sigProGalleria7e2eeb2c36
INPUT CHANNEL
<p
https://www.unomasunonegocios.com/index.php/en/hydroelectric-power-plant#sigProGalleria92d03b3e5d
ENGINES ROOM
https://www.unomasunonegocios.com/index.php/en/hydroelectric-power-plant#sigProGalleriad53d178682
PRESSURE PIPE
https://www.unomasunonegocios.com/index.php/en/hydroelectric-power-plant#sigProGalleria14fee1b506
To request technical and economic study please complete the form below: